  • The Odisha Works Department (OWD) had conducted a Strategic Option Study in 1995-1997 for the improvement of State Roads, which identified 2347 km out of 4600 km of State Highways and Major District Roads based on traffic volume, carriageway width, and pavement condition.

    The Government of Odisha contracted a Project Coordinating Consultant (PCC) for feasibility study of 2347 km to identify 700 km in two phases for techno-economic Appraisal with detailed project preparation to meet World Bank norms. The PCC had Completed detailed Engineering design for widening and strengthening including social and environmental aspects for a length of 198 km, which was declared National Highway (NH-224). From the result of techno-economic studies, 1200 km were Prioritized for a four-year periodic maintenance programme but the project was not Implemented due to poor fiscal situation of the State at that time. However, Government of Odisha has taken up the improvement 700 Km Under its various schemes. The Odisha Works Department (OWD) intends to upgrade and widen its vital arterial State roads to 2-lanes to accelerate the economic growth of the State immense Potential in mining, industry, tourism and port. Due to large investment required, the State has planned to avail a loan from World Bank for developing about 825 km of Roads under Phase-I limiting to the loan amount of US $250million spread over 5 Years.

    M/S CEG Limited has been engaged for providing the Consultancy services for preparation of the Detail Project Report for 825 km of roads under Phase-I. This Project also includes network analysis of 3700 km State Highways based on techno economic Approach to arrive at selection of 1600 km for feasibility studies for Subsequent Phases. The Consultancy services were commenced from 6th December 2005 and completed in Jan, 2008.

    The Project Roads are located in the State of Odisha . The Project Road is spread in 14 districts and forms and important link for movement of people and commerce. The Project Road is divided into five corridors and has a total length of 832 km. The list of the Project Road Corridors is given below in Table 1.1 along with the road designation and total length in km. The Project Roads consist of existing state highways and MDR.

  • LIST OF THE PROJECT ROAD
    SL.NO
    NAME OF THE ROAD
    SH/MDR
    LENGTH(K.M)
    1
    Bhawanipatna - Khariar Road
    SH 16
    68
    2
    Chandbali - Bhadrak - Anandpur Road

    SH - 9, SH 53

    95
    3
    Berhampur - Taptapani Road
    SH - 17
    41
    4
    Taptapani - Raipanka Road
    SH - 17
    68
    5
    Raipanka - JK Pur Road
    SH 17, SH - 4
    83
    6
    Jagatpur - Chandbali Road
    SH - 9A
    106
    7
    Bhawanipatna - Muniguda Road
    SH - 6
    70
    8
    Muniguda - Rayagada - Kereda Road
    SH 5, MDR 48B
    85
    9
    Daspalla - Narasinghpur - Banarpal Road
    MDR 18, MDR19
    89
    10
    Aska - Bhanjanagar Road
    SH 7
    39
    11
    Anandpur - Karanjia - Jashipur
    80
    Total
    845
  • PPP Projects :

    M/s PriceWaterHouseCoopers Pvt Ltd and Lea Associates South Asia Pvt. Ltd has been engaged by the Government of Odisha to carryout a Techno-Economic Feasibility Study and Financial Advisior for improvement of the following Roads under Public Private Partnership Mode.

  • LIST OF THE PROJECT ROAD
    SL.NO
    Subject
    1
    Four Laning of Sambalpur - Rourkela Road ( SH 10)
    165.4Km
      Status :
    Approvalof ECI on Dt. 11th June 2008
    Approval of HLCA on Dt.17 Nov 2009
    Report submitted by Consultants on Draft PPR ( Executive Summary ) ( Main Report) ( Annexure to Main Report ) (Design Report) ( Annexure to Design Report )( SIA and R & R ) ( EIA & EMP ) Drawings Part 1(37 MB) Part 2 ( 15 MB)]
    2
    Widening to two lanes from Joda to Bamebari ( Expressway - II)
    18Km
      Status:
    Approvalof ECI on Dt. 11th June 2008
    Report submitted by Consultants on Draft PPR ( Executive Summary ) ( Main Report) ( Annexure to Main Report ) (Design Report) (Annexure to Design Report )( Social Report ) ( EIA & EMP) Drawings (13 MB) ]
    3
    Widening to two lanes from Koira - Tensa and Lahunipada
    48Km
      Status :
    Approvalof ECI on Dt. 11th June 2008
    Report submitted by Consultants on Draft PPR ( Executive Summary ) ( Main Report) ( Annexure to Main Report ) (Design Report) ( Annexure to Design Report ) (Social Report) ( EIA & EMP) Drawings (22 MB) ]

Photo Gallery

OSRP

Contact Us

Chief Engineer, World Bank Project, Odisha
O/o- Engineer-In-Chief(Civil), Odisha.
Tel: +91-674-239 6783
Fax: +91 674 239 0080
Email : pmuosrp[at]gmail[dot]com